AGP Picks
View all

Fortuna intersects 0.96 g/t gold over 350 meters at the Lindero Mine, Argentina

VANCOUVER, British Columbia, Oct. 20, 2026 (GLOBE NEWSWIRE) -- Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to report results from infill drilling designed to test open mineralization at depth and upgrade Inferred Mineral Resources below the current life-of-mine (“LOM”) pit design of the gold porphyry deposit at the Lindero Mine in Argentina. The results confirm that gold mineralization extends significantly below the current reserve pit design.

Eric Chapman, Senior Vice President of Technical Services, commented, “The 2026 infill drilling program returned multiple intersections with gold grades consistent with or higher than the corresponding grades estimated in the block model.” Mr. Chapman added, “We are incorporating the drill results into an updated block model and pit design, targeted for completion by year-end. This work will support a revised LOM plan and an updated Mineral Reserve estimate for Lindero, incorporating both the upgraded gold mineralization and existing Indicated Mineral Resources currently located below the pit.” Mr. Chapman concluded, “This zone remains open at depth.”  

Lindero Mine Drilling highlights

LDH-259: 0.85 g/t Au  over a drilled length of 236 meters from surface
     
LDH-260: 0.98 g/t Au  over a drilled length of 281 meters from surface
     
LDH-261:

1.05 g/t Au 
2.35 g/t Au 
0.72 g/t Au 
2.07 g/t Au 
5.52 g/t Au 
3.95 g/t Au 
over a drilled length of 143 meters from surface, including
over a drilled length of 10 meters from 17 meters
over a drilled length of 149.6 meters from 149 meters, including
over a drilled length of 4 meters from 163 meters, and
over a drilled length of 2 meters from 205 meters, and
over a drilled length of 2 meters from 253 meters
     
LDH-262: 0.67 g/t Au  over a drilled length of 164 meters from 2 meters
     
LDH-265: 0.60 g/t Au  over a drilled length of 224 meters from surface
     
LDH-267: 0.70 g/t Au 
2.79 g/t Au 
over a drilled length of 263 meters from surface, including
over a drilled length of 2 meters from 38 meters
     
LDH-271: 0.94 g/t Au  over a drilled length of 134 meters from 144 meters
     
LDH-272: 0.96 g/t Au 
2.20 g/t Au 
2.45 g/t Au 
2.22 g/t Au 
over a drilled length of 350 meters from surface, including
over a drilled length of 6 meters from 10 meters, and
over a drilled length of 4 meters from 302 meters, and
over a drilled length of 2 meters from 316 meters
     
LDH-273: 0.71 g/t Au 
2.02 g/t Au 
over a drilled length of 203 meters from 156 meters, including
over a drilled length of 2 meters from 184 meters
     
LDH-286: 1.02 g/t Au 
2.06 g/t Au 
over a drilled length of 134 meters from surface, including
over a drilled length of 13 meters from 0 meters
     
LDH-288: 0.56 g/t Au  over a drilled length of 254 meters from surface
     

Note: Gold mineralization at Lindero is circular in nature and associated with a porphyry intrusive; therefore, a specific azimuth or dip cannot be defined for reporting estimated true widths.

The 2026 drill program consisted of 31 diamond drilling (“DD”) holes, totalling 8,534 meters, having been extended from the initially planned 6,000-meter program due to the success from the initial holes. The program was designed with two objectives, firstly to upgrade Inferred Mineral Resources below the current LOM pit design in the south portion of the Lindero Deposit, where higher gold grade mineralization was identified at depth. Secondly, to obtain metallurgical samples to affirm projected recoveries in areas planned for mining in the next two years. The upgrade drilling successfully encountered higher than expected gold mineralization in several holes, such as, LDH-259 that intersected 0.85 g/t Au over 236 meters from surface, including 94 meters averaging 0.66 g/t Au below the current pit design (refer to Figure 1) and LDH-272 that intersected 0.96 g/t Au over 350 meters from surface, including 98 meters averaging 0.91 g/t Au below the pit design (refer to Figure 2). An updated Mineral Resource and Mineral Reserve estimate will be prepared for inclusion in the year-end consolidated report, planned for release in the first quarter of 2027.

Gold mineralization at the Lindero Deposit forms a circular body approximately 600 meters in diameter and extends vertically more than 300 meters below the current topographic surface. The distribution of gold mineralization shows a strong relationship to lithology, stockwork veinlets, and alteration assemblages. Higher gold grades of more than 1 g/t Au, characterized by native, free-milling gold, are commonly associated with sigmoidal quartz, quartz-magnetite-sulfide, biotite-magnetite-chalcopyrite, magnetite-chalcopyrite, and quartz-limonite–hematite stockworks that are strongly associated with K-feldspar alteration. This association is most common in the southern and eastern portions of the deposit, where the highest gold grades occur. Where one or more stockwork types are absent or fracturing is less intense, mineralization tends to be weaker and gold grades lower at approximately 0.4 g/t Au.

Figure 1: Lindero Mine cross section 2623075E showing drill hole LDH-259

Lindero Mine cross section 2623075E showing drill hole LDH-259

Figure 2: Lindero Mine cross section 7226125N showing drill hole LDH-272

Lindero Mine cross section 7226125N showing drill hole LDH-272

Quality Assurance & Quality Control (QA - QC)

All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

All DD holes started with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of two meters or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

All DD samples were transported by commercial transport to ALS Patagonia S.A. preparation laboratory in Mendoza, Argentina. Sample pulps prepared by ALS Patagonia were then transported via commercial courier to ALS’s facility in Lima, Peru. Routine gold analysis using a 30-gram charge and fire assay with an atomic absorption finish was completed for all samples at ALS’s Lima laboratory plus ME-ICP61, analysis of 34 elements four acid ICP-AES. Samples returning assays >10 ppm Au were reanalysed using a 30-gram charge and fire assay with a gravimetric finish. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, ALS inserted their own quality control samples.

Qualified Person

Eric Chapman, Senior Vice President, Technical Services for Fortuna Mining Corp., is a Professional Geoscientist registered with Engineers and Geoscientists British Columbia (Registration No. 36328). Mr. Chapman has reviewed and approved the scientific and technical information contained in this news release. Mr. Chapman has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

About Fortuna Mining Corp.

Fortuna Mining Corp. is a Canadian precious metals mining company with three operating mines in Argentina, Côte d’Ivoire, and Peru, and the feasibility-stage Diamba Sud Gold Project in Senegal. Our exploration portfolio spans our operating jurisdictions as well as Guinea and Guyana. Sustainability is at the core of our operations and stakeholder relationships. We produce gold and silver while creating long-term shared value through efficient production, environmental stewardship, and social responsibility. For more information, please visit our website at www.fortunamining.com

ON BEHALF OF THE BOARD

Jorge A. Ganoza
CEO and Director
Fortuna Mining Corp.

Investor Relations:

Carlos Baca | info@fmcmail.com | fortunamining.com | X | LinkedIn | YouTube | Instagram | TikTok

Forward looking Statements

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements regarding exploration at the Lindero Mine, including the plans to incorporate the drill results into an updated block model and pit design, targeted by the end of 2026 which are intended to support a revised life of mine plan and an updated Mineral Reserve estimate for the Lindero Mine; statements that an updated Mineral Resource and Mineral Reserve estimate is intended to be prepared for inclusion in the year-end consolidated report, planned for release in the first quarter of 2027; statements that the zone drilled remains open at depth; statements about the Company’s business strategies, plans and outlook; the Company’s plans for its mines and mineral properties; changes in general economic conditions and financial markets; the impact of inflationary pressures on the Company’s business and operations; the future results of exploration activities; expectations with respect to metal grade estimates and the impact of any variations relative to metals grades experienced; assumed and future metal prices; the merit of the Company’s mines and mineral properties; and the future financial or operating performance of the Company. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “proposed”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “anticipated”, “estimated”, “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.

Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, operational risks associated with mining and mineral processing; uncertainty relating to Mineral Resource and Mineral Reserve estimates; uncertainty relating to capital and operating costs, production schedules and economic returns; risks relating to the Company’s ability to replace its Mineral Reserves; risks related to the conversion of Mineral Resources to Mineral Reserves; risks associated with mineral exploration and project development; uncertainty relating to the repatriation of funds as a result of currency controls; environmental matters including obtaining or renewing environmental permits and potential liability claims; uncertainty relating to nature and climate conditions; laws and regulations regarding the protection of the environment (including greenhouse gas emission reduction and other decarbonization requirements and the uncertainty surrounding the interpretation of omnibus Bill C-59 and the related amendments to the Competition Act (Canada); risks associated with political instability and changes to the regulations governing the Company’s business operations; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in countries in which the Company does or may carry on business; risks associated with war, hostilities or other conflicts, such as the Ukrainian – Russian, and Israeli – Hamas and Iran – Israel and United States conflicts, and the impacts they may have on global economic activity; risks relating to the termination of the Company’s mining concessions in certain circumstances; developing and maintaining relationships with local communities and stakeholders; risks associated with losing control of public perception as a result of social media and other web-based applications; potential opposition to the Company’s exploration, development and operational activities; risks related to the Company’s ability to obtain adequate financing for planned exploration and development activities; property title matters; risks related to the ability to retain or extend title to the Company’s mineral properties; risks relating to the integration of businesses and assets acquired by the Company; impairments; risks associated with climate change legislation; reliance on key personnel; adequacy of insurance coverage; operational safety and security risks; legal proceedings and potential legal proceedings; uncertainties relating to general economic conditions; risks relating to a global pandemic, which could impact the Company’s business, operations, financial condition and share price; competition; fluctuations in metal prices; risks associated with entering into commodity forward and option contracts for base metals production; fluctuations in currency exchange rates and interest rates; tax audits and reassessments; risks related to hedging; uncertainty relating to concentrate treatment charges and transportation costs; sufficiency of monies allotted by the Company for land reclamation; risks associated with dependence upon information technology systems, which are subject to disruption, damage, failure and risks with implementation and integration; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including, but not limited to, the accuracy of the Company’s current Mineral Resource and Mineral Reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or its production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted by unscheduled maintenance, labor and contractor availability and other operating or technical difficulties); the duration and effect of global and local inflation; the duration and impacts of geo-political uncertainties on the Company’s production, workforce, business, operations and financial condition; the expected trends in mineral prices, inflation and currency exchange rates; that all required approvals and permits will be obtained for the Company’s business and operations on acceptable terms including for the construction of a mine at the Diamba Sud Project, and for the expansion of the processing plant and for the use of the underground mining method at the Séguéla Mine; that there will be no significant disruptions affecting the Company's operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events, or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Mineral Resources and Reserves

Technical disclosure regarding the Company’s properties included in this news release has been prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. Canadian standards, including NI 43-101, differ from the requirements of the Securities and Exchange Commission, and information included herein may not be comparable to similar information disclosed by U.S. companies.

Appendix 1: Lindero Mine drill hole details and assay results

HoleID Easting (POSGAR94_2) Northing (POSGAR94_2) Elev. (m) EOH1,2
Depth (m)
UTM Azimuth Dip Depth2
From (m)
Depth2
To (m)
Drilled2
Width (m)
Au (ppm)
LDH-258 2623035 7226080 3748 269 98.51 -68.98 0 186 186 0.60
              194 252 58 0.53
            Including 198 202 4 2.37
LDH-259 2623080 7226050 3747 281 180 -90.0 0.0 236 236 0.85
LDH-260 2623025 7226090 3748 281 270 -75.0 0.0 281 281 0.98
LDH-261 2623029 7226090 3748 298.6 90 -76.0 0.0 143 143 1.05
            Including 17.0 27 10 2.35
              149.0 298.6 149.6 0.72
            Including 163.0 167 4 2.07
            Including 205.0 207 2 5.52
            Including 253.0 255 2 3.95
LDH-262 2623236 7226050 3748 230 0 -90.0 2.0 166 164 0.67
              178.0 192 14 0.59
              208.0 230 22 0.32
LDH-263 2623101 7226145 3804 341 180 -77.0 0.0 102 102 0.62
              134.0 288 154 0.60
            Including 172.0 174 2 4.68
            Including 194.0 196 2 2.46
            Including 204.0 208 4 2.69
              292.0 334 42 0.33
LDH-264 2622973 7226050 3787 299 270 -80.0 0.0 130 130 0.47
              134.0 168 34 0.37
              202.0 210 8 0.29
              246.0 278 32 0.28
              286.0 299 13 0.24
LDH-265 2623105 7226137 3804 362 270 -78.0 0.0 224 224 0.60
              262.0 272 10 0.31
              336.0 344 8 0.26
LDH-266 2623147 7226116 3796 302 270 -90.0 22.0 152 130 0.68
            Including 104.0 108 4 4.40
              182.0 242 60 0.36
              244.0 267 23 0.38
              269.0 281 12 0.34
              287.0 302 15 0.44
LDH-267 2622943 7226100 3793 263 270 -80.0 0.0 263 263 0.70
            Including 38.0 40 2 2.79
LDH-268 2622943 7226175 3800 251 0 -90.0 92.0 106 14 0.28
              116.0 134 18 0.32
              136.0 250 114 0.43
LDH-269 2622923 7226148 3798 380 90 -80.0 76.0 116 40 0.29
              118.0 156 38 0.35
              160.0 342 182 0.49
              344.0 368 24 0.27
LDH-270 2622897 7226111 3798 302 90 -80.0 0.0 106 106 0.47
              108.0 152 44 0.31
              154.0 204 50 0.33
              210.0 232 22 0.31
              244.0 294 50 0.45
LDH-271 2622980 7226200 3803 407 0 -90.0 0.0 54 54 0.44
              108.0 142 34 0.40
              144.0 278 134 0.94
              284.0 356 72 0.75
LDH-272 2622912 7226124 3798 350 91.87 -74.29 0.0 350 350 0.96
            Including 10.0 16 6 2.20
            and 302.0 306 4 2.45
            and 316.0 318 2 2.22
LDH-273 2622942 7226224 3795 359 283.82 -88.98 28.0 38 10 0.26
              156.0 359 203 0.71
            Including 184.0 186 2 2.02
LDH-274 2622936 7226177 3799 380 351.05 -89.2 104.0 114 10 0.38
              122.0 248 126 0.40
              252.0 270 18 0.33
              278.0 290 12 0.42
              318.0 368 50 0.44
            Including 320.0 322 2 1.63
LDH-275 2623384 7226150 3796 257 270.73 -73.16 0.0 9 9 0.93
            Including 5.0 7 2 2.31
              17.0 203 186 0.53
              205.0 217 12 0.50
              223.0 257 34 0.75
LDH-276 2623340 7226235 3787 296 187.55 -79.03 0.0 19 19 0.30
              21.0 77 56 0.33
              83.0 117 34 0.29
              119.0 253 134 0.46
              263.0 296 33 0.69
LDH-277 2623259 7226184 3788 320 132.03 -88.9 0.0 30 30 0.36
              40.0 150 110 0.74
            Including 98.0 102 4 2.82
              158.0 186 28 0.32
              196.0 240 44 0.47
            Including 208.0 210 2 1.28
              298.0 320 22 0.30
LDH-278 2623280 7226222 3788 324 86.64 -79.73 0.0 53 53 0.55
              168.0 194 26 0.29
              196.0 234 38 0.43
              242.0 264 22 0.31
              304.0 324 20 0.28
LDH-279 2623300 7226221 3788 299 181.03 -77.19 0.0 22 22 0.35
              44.0 56 12 0.22
              62.0 80 18 0.28
              86.0 112 26 0.32
              124.0 208 84 0.42
              210.0 238 28 0.43
            Including 236.0 238 2 2.03
              244.0 260 16 0.33
              272.0 299 27 0.54
LDH-280 2623360 7226250 3787 113 247.99 -89.79 0.0 76 76 0.34
              82.0 113 31 0.28
LDH-281 2623377 7226202 3790 164 270 -70.0 0.0 77 77 0.38
              83.0 134 51 0.41
LDH-282 2623234 7226049 3756 299 0 -90.0 0.0 170 170 0.60
              178.0 226 48 0.41
              228.0 292 64 0.72
            Including 236.0 240 4 2.26
LDH-283 2622921 7226198 3796 290 270 -72.0 43.0 51 8 0.26
              55.0 65 10 0.42
              71.0 194 123 0.60
            Including 156 194 38 0.30
              206.0 230 24 0.61
LDH-284 2622889 7226350 3843 179 90 -70.0 0.0 179 179 0.67
LDH-285 2622990 7226400 3799 140 0 -90.0 0.0 139 139 0.58
LDH-286 2623049 7226389 3780 134 0 -90.0 0.0 134 134 1.02
            Including 0.0 13 13 2.06
LDH-287 2623161 7226378 3772 110 276.95 -73.19 10.0 24 14 0.34
              30.0 110 80 0.60
            Including 52.0 54 2 4.68
LDH-288 2623160 7226378 3772 254 317.52 -89.52 0.0 254 254 0.56
                     

Notes:
1. EOH: End of hole
2. Depths and widths reported to nearest significant decimal place
3. Gold mineralization at Lindero is circular in nature and associated with a porphyry intrusive; therefore, a specific azimuth or dip cannot be defined for reporting estimated true widths

A PDF accompanying this announcement is available at

http://ml.globenewswire.com/Resource/Download/6b79c9d5-f312-406d-ae24-df8ccf702979

Photos accompanying this announcement are available at 

https://www.globenewswire.com/NewsRoom/AttachmentNg/b43e1d9a-1194-4233-867a-c2a766bf4a3a

https://www.globenewswire.com/NewsRoom/AttachmentNg/423288a3-6497-4a70-9f9e-7dcf4e871bb5


Primary Logo

Figure 1:

Lindero Mine cross section 2623075E showing drill hole LDH-259
Figure 2:

Lindero Mine cross section 7226125N showing drill hole LDH-272

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Arizona Industry Reporter

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.